BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//FX101.9 - ECPv4.6.26//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:FX101.9
X-ORIGINAL-URL:https://fx1019.ca
X-WR-CALDESC:Events for FX101.9
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190806
DTEND;VALUE=DATE:20190811
DTSTAMP:20260417T053803
CREATED:20190806T170154Z
LAST-MODIFIED:20190806T170154Z
UID:9663-1565049600-1565481599@fx1019.ca
SUMMARY:Closures for the Macdonald Bridge
DESCRIPTION:  \nThe following are the scheduled closures for the Macdonald Bridge to replace an approach span bearing and an expansion joint on the Dartmouth side of the bridge. \n\n7:00pm to 5:30am Tuesday Aug 06 – bike lane will be closed. Cyclists will be directed to use the sidewalk\n7:00pm to 5:30am Wednesday Aug 07 – sidewalk will be closed. Walkers will be directed to use the bike lane\n7:00pm to 5:30am Thursday Aug 08. FULL bridge closure including sidewalk and bike lane. Shuttle service provided*\n7:00pm Friday\, August 9 to 9pm Saturday\, August 10. FULL bridge closure. Sidewalk and bike lane will be open.\n\nAll four lanes on the MacKay Bridge will be open during these closures. \n
URL:https://fx1019.ca/event/closures-for-the-macdonald-bridge/
END:VEVENT
END:VCALENDAR